Home / Projects / Agaard Road Culvert Replacement Project

Agaard Road Culvert Replacement Project

SWCD Branded Separator
Degraded culvert on Finger Creek.
  • Location of future bridge.

  • Streamside area with healthy understory vegetation.

  • Underwater photo of steelhead with distinct red band on rock streambed.

    Winter steelhead reside in the Gales creek watershed.

The Gales Creek community is home to some of the best fish habitat in all of Washington County. However, outdated culverts create unnatural narrow channels and quick flowing streams that fish are unable to pass. Because of the culverts, fish like salmon and steelhead miss out on high quality habitat where they would spawn and where juvenile fish would grow before returning to the ocean.

Streamside area with healthy understoryUnderstory The layer of plants that exists closer to the ground under large trees. vegetation.
Degraded culvert on Finger Creek.
Degraded culverts on Coffee Creek.

With support of neighbors along Agaard Road, Tualatin Soil and Water Conservation District and Tualatin River Watershed Council are teaming up to replace the culverts with bridges. Ultimately, this will address much needed improvements for ecological restoration and reduce wintertime flooding of the roadway.


Update: July 15, 2026

The Agaard Road Culvert Replacement Project is complete!

Read about the finished project here.

Postcard image about the project.

Update: October 31, 2025

The in-stream work for this project is complete!

Final work, including realigning utility lines, will be completed in early 2026.

Update: July 28, 2025

Update: May 15, 2025

Construction will start on or after June 2nd, 2025*. Here is what to expect:

Contractors and Crew

Contractors and crew will be working on NW Agaard Rd. and around the stream. They will not enter your property unless you have already granted permission.

Noise

The excavation and construction process can be loud at times. Expect work Monday-Saturday. Crews often arrive as early as 6:30am and begin work at 7am.

Dust

Contractors will reduce dust by spraying water on the construction site.

Traffic

Traffic delays will be minimal. Access, including emergency vehicles, will be available 24/7.

Timeline

Project updates will be provided regularly. Construction is scheduled to finish by October 31st, 2025. 

Examples of what the construction site could look like:

Photo of a streamside construction site with heavy machinery and erosion control devices.
A photo of a streamside construction site with a temporary dam and a hose pumping water from downstream.
Photo of streamside construction site, with large plastic containers blocking stream flow and a hose pumping water from downstream.
A streamside construction site with heavy machinery and a temporary culvert.

The project is funded in part by the USDA NRCS Regional Conservation Partnership Program, ODFW’s Private Forest Accord Grant Program, Tualatin Soil and Water Conservation District, and Clean Water Services.

Project Contacts

BETHANY LUND – Habitat Conservation Coordinator
Bethany Lund
Habitat Program Coordinator

(503) 467-9565

« Protecting Freshwater Mussels in the Tualatin River Watershed
Learning from Leaves: Will these Native Plants Survive or Thrive? »

Posted In:

Neighborhood Stream Restoration
SWCD Branded Separator

Share:

Share on Facebook Share on X (Twitter) Share on Pinterest Share on LinkedIn Share on Email
Subscribe News Icon

Email me about caring for the soil and water!

Get Involved Icon

Find an Event

Calendar of Events
Upcoming Workshops

reflection in a lake

About Us

  • Our Story
  • Our Watershed
  • Our Staff
  • Our Board
  • Careers
  • Reports & Publications

Resources

  • Event Calendar
  • Weed & Pest Directory
  • Contractor Directory
  • Library & Videos
  • Tool Loan Program
  • News
  • Watershed Navigator

Contact Us

Tualatin Soil and Water
Conservation District
7175 NE Evergreen Pkwy #400
Hillsboro, OR. 97124

Phone: 503-334-2288
Office Hours: 8:00am - 4:30pm
Email Us

Follow Us

© 2026 Tualatin Soil and Water Conservation District. All Rights Reserved. | Sitemap | Non-Discrimination Policy | Privacy Policy | Website Design by Hoopla Creative

Loading Comments...